In Fukuoka City Rapid Transit subway system the total system computer consists of six subsysems which are linked on-line to each other. The six subsystems are the train traffic control system, automatic train operation system, electric power supply control system, information transmission system, automatic car inspection system, and supporting business management system. This article gives abstracts of each subsystem and the relationship between them.
Total subway system computer
Untergrundbahn mit Gesamtsystem-Prozessrechner
Hitachi Review ; 31 , 1 ; 28-33
1982
6 Seiten, 7 Bilder, 1 Tabelle, 3 Quellen
Article (Journal)
English