Traffic speeds and flows were observed within the Central Glasgow Area “before” and “after” the implementation of a traffic system — known as the “Clyderail Traffic Management Scheme” — in July 1976. These were grouped according to different categories of the streets concerned (three categories in total) and to different effective widths within each category. Ten sets of speed and corresponding flow observations then emerged and a speed/flow (curvelined) relationship was obtained for each of them. Furthermore, these relationships were brought into a simplified linear form and reduced to three, by fitting a single formula to the resulting lines within each of the three categories.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Speed/flow relationships in the central Glasgow area


    Contributors:

    Published in:

    Publication date :

    1980-01-01


    Size :

    6 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown



    Glasgow central railway

    Engineering Index Backfile | 1896


    Area speed flow relationships and strategic models

    May,A.D. / Shepherd,S.P. / Univ.of Leeds,Inst.for Transport Studies,GB | Automotive engineering | 1996


    Area speed-flow relationships and network aggregation

    May, A. D. / Shepherd, S. P. | British Library Conference Proceedings | 1996


    Area Speed Flow Relationships and Strategic Models

    May, A. D. / Shepherd, S. P. | British Library Conference Proceedings | 1996


    Area speed flow relationships by micro simulation : gird networks

    May, Anthony D. ;Shepherd, Simon P. | SLUB | 1994