Abstract Research background and significance of railway train working diagram plan system is introduced, and system research process including six stages is proposed, and point out that at present, the train working diagram planning system research is in the fifth stage. Then, the train working diagram system 4.0 developed at present is introduced, and effect of the system are proposed. Furthermore, system key technology and main innovation are analyzed, including the unified algorithm applying for both single lines and double lines, the general data model and computers-supported cooperative work method for train working diagram plan system. Then, based on the constantly changing railway network construction and transportation market environment, the challenges of high-speed railway transportation organization and freight transportation organization based on limit delivery time are analyzed. Finally, research prospects of the system is put forward.
Railway Train Working Diagram Plan System
2017-11-03
7 pages
Article/Chapter (Book)
Electronic Resource
English
Train Working Diagram System of High- and Middle-Speed Train on JingHu High-Speed Railway Line
British Library Conference Proceedings | 2000
|Microcosmic road network-based high-speed railway train working diagram compilation method
European Patent Office | 2024
|Train Operation Diagram Information System for China Railway
British Library Conference Proceedings | 2009
|