Abstract This paper presents the risk analysis of revenue and traffic forecast of a Build Operate Transfer (BOT) road project using cumulative distribution method. In road project, traffic is the main source to earn money/revenue. Traffic is projected using various methods. Actual traffic may not follow the projected traffic and actual traffic may be reduced/increased depending on the development of the road side and near areas. Rapid development i.e., industrial, commercial, business activity creates rapid traffic growth rate which is not expected and reverse happening where road side development is negligible. Traditional traffic forecast may not consider the risk of projected traffic. This paper presents the risk analysis of the projected traffic and alternatively revenue with a real case study and determine lower and upper limit of revenue and expected revenue has been determined using Monte Carlo Simulation Method.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Traffic and revenue forecast at risk for a BOT road project


    Contributors:

    Published in:

    Publication date :

    2012-09-01


    Size :

    8 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    Traffic and revenue forecast at risk for a BOT road project

    Bagui, Swapan Kumar / Ghosh, Ambarish | Online Contents | 2012


    Traffic Analysis and Forecast for Meghalaya Road Network

    Singh, Manmeet / Kumar, Ravindra | Springer Verlag | 2022


    Car Ownershipp in the National Road Traffic Forecast

    Smith, C. A. / Assessments, Policy and Methods Division, Highways Policy and Assessment Directorate, Department of Transport | TIBKAT | 1981


    Traffic forecast

    Online Contents | 1998


    Traffic Forecast

    NTIS | 1967