Abstract Launch vehicle tests include many important activities, particularly during the development phase. However, when the rocket begins launch services, system level tests focus on avionics system integration after assembly, mainly by simulating flight processes, also known as general check in China. The general check is performed hierarchically. The control (or GNC) subsystem is checked first, and then other systems, such as the telemetry system, etc. The shutdown time of every stage may be controlled around the theoretical value by modeling the shutdown equation.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    System Level Testing


    Contributors:


    Publication date :

    2018-01-01


    Size :

    40 pages




    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    System Level HIRF Testing

    Scott, P. C. / IEEE / AIAA | British Library Conference Proceedings | 1993


    System‐Level Testing of Spacecraft

    Wolf, Johannes | Wiley | 2018


    Real-Time System-Level Integrated Testing

    T. Wells / K. Maples | NTIS | 1998


    System level testing and chamber correlation

    Jennings,P. / Univ.of Warwick,GB | Automotive engineering | 1990


    Automating FNOS vehicle network system-level and module-level testing

    Brown,C.S. / Vector CANtech,US | Automotive engineering | 2002