Abstract Launch vehicle tests include many important activities, particularly during the development phase. However, when the rocket begins launch services, system level tests focus on avionics system integration after assembly, mainly by simulating flight processes, also known as general check in China. The general check is performed hierarchically. The control (or GNC) subsystem is checked first, and then other systems, such as the telemetry system, etc. The shutdown time of every stage may be controlled around the theoretical value by modeling the shutdown equation.
System Level Testing
2018-01-01
40 pages
Article/Chapter (Book)
Electronic Resource
English
British Library Conference Proceedings | 1993
|System‐Level Testing of Spacecraft
Wiley | 2018
|Real-Time System-Level Integrated Testing
NTIS | 1998
|System level testing and chamber correlation
Automotive engineering | 1990
|Automating FNOS vehicle network system-level and module-level testing
Automotive engineering | 2002
|