Abstract Leakage in engineering structures is considered as one of the main issues. Analysis of the amount of water leakage can be useful in preventing such events. Deriner Dam consists of a concrete arch dam with ancillary structures including tunnels, and an underground powerhouse with an installed capacity of 670 MW. Leakage was observed on the powerhouse after the construction stage. For this purpose, a number of geotechnical data (including rheological and mechanical properties of the grout mixes) were re-assessed to examine the source of leaking. For determination of leakage source, graphics of grout curtain were prepared by using grouting charts with the RockWorks v.16 program. Leakage zones were obtained according to the prepared graphics and showed on 3D model. The results show that temperature variation of grouting mixes is the primary cause of leakage and its effect observed in the underground powerhouse wall of the Deriner Dam.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Leakage Analysis of Deriner Dam (Artvin-Turkey) Using 3D Modeling


    Contributors:

    Published in:

    Publication date :

    2017-11-30


    Size :

    7 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    Leakage Analysis of Deriner Dam (Artvin-Turkey) Using 3D Modeling

    Ozcelik, Mehmet / Tuzlu, Fatih | Online Contents | 2018



    Impacts of Artvin Rize Airport on Transportation and Environment

    Merve Erdoğan / Ozge Ercoskun | DOAJ | 2021

    Free access

    Modeling Car Ownership in Turkey Using Fuzzy Regression

    Selçuk Öğüt, Kemal | Taylor & Francis Verlag | 2006


    Modeling Car Ownership in Turkey Using Fuzzy Regression

    Selçuk Ögüt, Kemal | Online Contents | 2006