Abstract The aim of this paper is to present the recent literature that has advanced in the field of maritime logistics, specifically with regards to the consideration of vessel stability during the process of unloading and/or loading containers onto vessels. This process is essentially known as the Quay Crane Scheduling Problem (QCSP) which determines the operational profile of each quay crane in terms of the container tasks and timing. The literature on this and other problems pertaining to quayside operational planning is presented, before introducing the works with a contribution in ship stability. The works are described with insights into their formulation and solution techniques, as well as their contribution to the literature. Most importantly, the results are discussed and directions are provided for future work in the area.
Ship Stability Considerations in the Quay Crane Scheduling Problem
2017-09-05
9 pages
Article/Chapter (Book)
Electronic Resource
English
Next-generation quay crane scheduling
Elsevier | 2020
|Constraint programming approach to quay crane scheduling problem
Online Contents | 2013
|Constraint programming approach to quay crane scheduling problem
Elsevier | 2013
|