Abstract To improve the scheduling efficiency in the Pubugou Hydropower Project, this paper studies the practical resource-constrained project scheduling problem with multi-mode (MRCPSP) in its Construction and Decoration Systems. By taking into account the roughness and randomness in the hybrid uncertain environment, a rough random Multiple Objective Decision Making (MODM) model is presented. To deal with the complex uncertainties, the rough random expected value model is used to obtain an equivalent crisp model. Subsequently, motivated by the particular nature of MODM model, Multiple Objective Particle Swarm Optimization (MOPSO) algorithm is employed to search the Pareto optimal solutions. An practical application to Construction and Decoration Systems in Pubugou Hydropower Project is presented to verify the practicability of the proposed rough random MODM model and the efficiency of the solution algorithm.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China


    Contributors:
    Zhang, Zhe (author) / Xu, Jiuping (author)

    Published in:

    Publication date :

    2014-05-20


    Size :

    13 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Chaotic differential evolution algorithm for resource constrained project scheduling problem

    Chen, Weiming / Ni, Xiaoyang | British Library Online Contents | 2014



    Resource constrained project scheduling by harmony search algorithm

    Giran, Omer / Temur, Rasim / Bekdaş, Gebrail | Online Contents | 2017


    Resource constrained project scheduling by harmony search algorithm

    Giran, Omer / Temur, Rasim / Bekdaş, Gebrail | Springer Verlag | 2017