Unlike during the flight, the rocket engine is normally tested more than once on the test facility. The Vulcain n° M204 was tested 25 times on the facility P5 and the accumulated test time totalled 13.788,s. Various tests (duration, operational points, regulation, etc.) are executed, covering the required range around the design point or around the operational point planned for the flight (see Sect. 4.5). Therefore on the test facility it is possible to perform extreme operational points, durations, various boundary conditions, and it is possible to test for malfunction of engine components.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Test Periods


    Additional title:

    Springer Aerospace Techn.


    Contributors:


    Publication date :

    2010-08-20


    Size :

    16 pages





    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    OIL DRAIN PERIODS

    JENNINGS, HENRY | SAE Technical Papers | 1959


    Ship vibration periods

    Taylor, J.L. | Engineering Index Backfile | 1928


    Oil drain periods

    Jennings, H. | Engineering Index Backfile | 1959


    Ship vibration periods

    Taylor, J.L. | Engineering Index Backfile | 1928


    Dismissing return periods!

    Serinaldi, F. | British Library Online Contents | 2015