The optical system test for the James Webb Space Telescope (JWST) requires one of the largest available vacuum chambers operating at cryogenic temperatures (<45K). The test includes verification of a segmented 6.6m-diameter primary mirror with a radius of curvature of 16m. In addition, the chamber must accommodate flight instruments and test equipment above and below the telescope. ITT, under contract for this test, teamed with Northrop Grumman Space Technology (NGST), the prime contractor, and the NASA Goddard Space Flight Center (GSFC) to optimize the test configuration. The new configuration minimizes operation within the chamber, leverages recent technologies in interferometry to minimize ground-based environmental influences, and utilizes the chamber itself as the test bench to reduce the cryogenic thermal mass. The result enables an effective system-level test in Chamber A at the NASA Johnson Space Center (JSC).
Optimizing the cryogenic test configuration for the James Webb Space Telescope
Modeling, Systems Engineering, and Project Management for Astronomy II ; 2006 ; Orlando,Florida ,United States
Proc. SPIE ; 6271
2006-06-12
Conference paper
Electronic Resource
English
James Webb Space Telescope Pathfinder First Cryogenic Test Thermal Analysis
British Library Conference Proceedings | 2012
|James Webb Space Telescope Integration & Test
AIAA | 2016
|NTRS | 2017
|NTRS
|