A two machine Automated Fiber Placement (AFP) cell capable of laying 1/2\mi and 1/4\mi tow at rates up to 1800\mi/min (45.7 m/min), including feeds and cuts, has been implemented for the manufacture of large primary aircraft structures.The control architecture of the cell is such that part programs are machine independent and can run on either machine or simultaneously on both machines at the same time. A Central Cell Controller pushes part programs to each AFP machine and coordinates the cell.Volumetric accuracy of the two machines is under 0.008\mi (0.2 mm) radial error in the entire compensated envelop, which is approximately 64' x 21' x 14' (19.5 m x 6.4 m x 4.3 m) for each machine. This is accomplished through optimization of volumetric kinematic compensation parameters using a linear numerical solver. The machines reference a common coordinate system which allows great flexibility in part programming.A detachable head design was implemented which allows each machine to swap between 1/4\mi and 1/2\mi tow widths in 120 seconds. The creel is contained on the head which provides very short tow paths and isolates the AFP process to the detachable tool. This allows creel re-fills, AFP head maintenance, repair, and upgrade of AFP head to be performed off line without interrupting production.
Production Implementation of Multiple Machine, High Speed Fiber Placement for Large Structures
Sae Int. J. Aerosp
SAE 2010 Aerospace Manufacturing and Automated Fastening Conference & Exhibition ; 2010
Sae International Journal of Aerospace ; 3 , 1 ; 216-223
2010-09-28
8 pages
Conference paper
English
High-Speed Fiber Placement on Large Complex Structures
SAE Technical Papers | 2007
|Medium Wave Infrared Heater for High-Speed Fiber Placement
SAE Technical Papers | 2007
|Fiber placement production methods
Emerald Group Publishing | 2000
Medium Wave Infrared Heater for High-Speed Fiber Placement
British Library Conference Proceedings | 2007
|Operation/Maintenance of Fiber Placement Machine
NTIS | 2000
|