A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a Space Station Freedom (SSF) pre-development water recovery system. Potable, hygiene, and urine reclamation subsystems were integrated with end-use equipment items and successfully operated for a total of 35 days, including 23 days in closed-loop mode with man-in-the-loop. Although several significant subsystem physical anomalies were encountered, reclaimed potable and hygiene water routinely met current SSF water quality specifications. This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies, and major lessons learned.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Phase III Integrated Water Recovery Testing at MSFC: Closed Hygiene and Potable Loop Test Results and Lesson Learned


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    International Conference On Environmental Systems ; 1992



    Publication date :

    1992-07-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English






    Phase III Integrated Water Recovery Testing at MSFC: Single Loop Test Results and Lessons Learned

    Carter, Donald Layne / Bagdigian, Robert M. | SAE Technical Papers | 1993


    Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned

    Holder, D. W. / Carter, D. L. / Hutchens, C. F. et al. | British Library Conference Proceedings | 1995


    Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned

    Hutchens, Cindy F. / Carter, D. Layne / Holder, Donald W. | SAE Technical Papers | 1995