LIMITED SCOPE REVISION IS REQUIRED TO MAKE DOCUMENT CHANGES TO ELIMINATE CONDITIONS THAT HAVE RESULTED IN PRODUCT FIELD FAILURES: (1) CHANGE TABLE 1 “D” HOLE DIAMETER FOR -4A AND CHANGE THE “E” DIMENSION FOR -4A AND -10A, (2) ADD INFO TO THE STOCK DEPLETION STATEMENT, AND (3) ADD TABLE 3 (AS27212 APPLICATION DETAILS) TO THE APPLICATION NOTES.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    LINK, TERMINAL, CONNECTING


    Publication date :

    2021-10-28



    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    LINK, TERMINAL, CONNECTING

    SAE Technical Papers | 2009


    LINK, TERMINAL, CONNECTING

    SAE Technical Papers | 2019


    LINK, TERMINAL, CONNECTING

    SAE Technical Papers | 2018


    The connecting link

    Perrin, Nicola | IuD Bahn | 2004


    LINK CONNECTING STRUCTURE

    WANG WEN-PIN | European Patent Office | 2022

    Free access