The challenge of effective nitrogen removal with a low Equivalent System Mass remains a goal of long-term manned space mission research. Ultimately, efficient organics removal followed by novel nitrogen removal processes will be advantageous compared to conventional fully-aerobic or anoxic-aerobic treatment systems. To date, the majority of research investigating the treatability of Early Planetary Base (EPB) ersatz wastewater formulations has involved the use of aerobic and anoxic treatment processes. However, little work has been published on studies done under strictly anaerobic conditions. In this work, a laboratory-scale anaerobic sequencing batch reactor (SBR) was fed EPB ersatz for 110 days. Initially, the reactor exhibited instability and biomass washout, with chemical oxygen demand (COD) removal of 22.7% ± 9.3%. After reseeding with new biomass, providing a supplementation phase, and increasing the SBR cycle duration from 6 hours to 12 hours, COD removal improved to 48.9% ± 10.8%. This performance was statistically different from the previous phase (P=0.004), demonstrating that longer cycle times favored increased organic removal. The supplementation period, during which the biomass was able to adapt to soap-based wastewater, resulted in more stable operation and prevented immediate biomass washout. Ammonia increased in the reactor effluent, due to conversion of organic nitrogen to ammonia. While COD removal performance was lower than expected, results suggest that anaerobic pretreatment is viable for increasing the nitrogen to organic carbon ratio of the wastewater, an important consideration for potential downstream nitrogen removal processes.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Anaerobic Stabilization of Early Planetary Base Ersatz Wastewater Formulation


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    International Conference On Environmental Systems ; 2006



    Publication date :

    2006-07-17




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Chive Growth in Biologically Treated Early Planetary Base Wastewater

    Morse, Audra / Vairavan, Bala / Green, Cary et al. | SAE Technical Papers | 2005


    Chive Growth in Biologically Treated Early Planetary Base Wastewater

    Vairavan, B. / Morse, A. / Jackson, W. A. et al. | British Library Conference Proceedings | 2005


    Ersatz Wastewater Formulations for Testing Water Recovery Systems

    Finger, Barry W. / Verostko, Charles E. / Carrier, Chris | SAE Technical Papers | 2004


    Ersatz Wastewater Formulations for Testing Water Recovery Systems

    Verostko, C. E. / Carrier, C. / Finger, B. W. et al. | British Library Conference Proceedings | 2004


    Ersatz Preussen. The "Ersatz Preussen"

    Engineering Index Backfile | 1930