A punched tape program is being used to control power shift transmission test stands operating as single or multiple units. Any desired shift sequence (sequence or skip shifting) is availabel with no concern for rate of shift lever movement, accuracy of detent postions, etc. Transmission shifting is accomplished by using electric solenoid valves to control the shift valves. Test unit design and construction, the test controller, test cycle design, test results, laboratory-field correlation, engine, costs, and test stand deficiences are covered. This system provides test flexibility, rapid data acquisition, engine life data, and minimum equipment investment.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Punched Tape Control of Power Shift Transmission Test Stands


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    1973 SAE International Off-Highway and Powerplant Congress and Exposition ; 1973



    Publication date :

    1973-02-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Data Acquisition Using Punched Paper Tape

    Van Gerpen, H. W. | SAE Technical Papers | 1967


    Motorized shoulder belt runs on punched tape

    Toyota Motor,JP | Automotive engineering | 1980