The need for clear definition of accuracy performance and operating criteria for Load Indicating Systems has been voiced by crane operators, crane manufacturers, and legislative agencies. A thorough study of the existing Recommended Practice was undertaken with the specific goal to upgrade J-376 to permit greater understanding of the minimum performance requirements of Load Indicating Systems.
Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice
Sae Technical Papers
1975 SAE International Off-Highway and Powerplant Congress and Exposition ; 1975
1975-02-01
Conference paper
English