This paper summarizes the two CODAG applications which the U. S. Coast Guard plans to put into operation. The first application has been shop tested and is being installed in a new cutter. The second application is being designed at the present time. Design configuration and advantages and disadvantages, as well as discussion of separate components of machinery and controls, are included.
Combined Diesel — Gas Turbine Power Plants in Coast Guard Vessels
Sae Technical Papers
Pre-1964 SAE Technical Papers ; 1906
1963-01-01
Conference paper
English
Combined diesel-gas turbine power plants in coast guard vessels
Engineering Index Backfile | 1963
|Combined diesel-gas turbine power plants in coast guard vessels
Engineering Index Backfile | 1963
|Coast guard ice-breaking vessels
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1935
WORKBOATS - Bollinger Renovates Coast Guard Vessels
Online Contents | 2003