This paper summarizes the two CODAG applications which the U. S. Coast Guard plans to put into operation. The first application has been shop tested and is being installed in a new cutter. The second application is being designed at the present time. Design configuration and advantages and disadvantages, as well as discussion of separate components of machinery and controls, are included.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Combined Diesel — Gas Turbine Power Plants in Coast Guard Vessels


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    Pre-1964 SAE Technical Papers ; 1906



    Publication date :

    1963-01-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English


    Keywords :



    Geared-diesel coast guard tenders

    Engineering Index Backfile | 1940


    Diesel electric coast guard ice breakers

    Robison, D. | Engineering Index Backfile | 1945