The objective in a flexible manufacturing system is an optimal system resources scheduling. The production scheduling of such system may be resolved by a set of individual agents, which can work parallel and their coordination may bring a more effective way to find an optimal solution. Criteria for the optimal solution may be created on the time or economical (cost) basis but each may have a different priority depending on each situation. In this paper we will analyse an approach to find a feasible schedule of all products, which could minimize their costs and satisfy all constrains jointed with each product.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Agent Based Scheduling in Production System


    Additional title:

    Sae Technical Papers


    Contributors:
    Frankovic, B. (author) / Moeller, K. (author) / Dang, T. T. (author)

    Conference:

    Automotive and Transportation Technology Congress and Exposition ; 2001



    Publication date :

    2001-10-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Agent based scheduling in production system

    Frankovic,B. / Dang,T.T. / Slovak Academy of Sciences,YU | Automotive engineering | 2001


    2001-01-3225 Agent Based Scheduling in Production System

    Frankovic, B. / Dang, T. T. / Moeller, K. et al. | British Library Conference Proceedings | 2001


    Autonomous agent scheduling

    BAYS MATTHEW J / WETTERGREN THOMAS A | European Patent Office | 2019

    Free access

    Multi-agent system for dynamic scheduling

    Firme, B. / Lopes, G. / Martins, M. et al. | BASE | 2020

    Free access

    Web3.0-based multi-agent collaborative scheduling system and method

    LU QIJUN / LU BING / FU XIAOJIN | European Patent Office | 2023

    Free access