The General Motors Aero Lab’s Full-Scale Wind Tunnel Facility, which came into operation in August of 1980[1], has undergone the significant upgrade of installing a state-of-the-art moving ground plane system. After almost four decades of continuous use the full-scale wind tunnel also received some significant maintenance to other areas, including a new heat exchanger, main fan overhaul, and replacement of the test section acoustic treatment. A 5-belt system was installed along with an integrated vehicle lift system. The center belt measures 8.5m long and can accommodate two belt widths of 1100mm and 950mm. Flow quality and other wind tunnel performance parameters were maintained to prior specifications which are on par with the latest industry standards [2]. The new 5-belt rolling road system maintains GM’s industry leading vehicle aerodynamic development and the improved acoustic panels ensure GM continues to develop vehicles with leading class acoustics.
General Motors Full Scale Wind Tunnel Upgrade
Sae Technical Papers
WCX SAE World Congress Experience ; 2020
2020-04-14
Conference paper
English
General Motors Full Scale Wind Tunnel Upgrade
British Library Conference Proceedings | 2020
|General Motors Full Scale Wind Tunnel Upgrade
British Library Conference Proceedings | 2020
|General Motors' New Reduced Scale Wind Tunnel Center
British Library Conference Proceedings | 2017
|The General Motors Engineering Staff Aerodynamics Laboratory - A Full-Scale Automotive Wind Tunnel
SAE Technical Papers | 1982
|General Motors’ New Reduced Scale Wind Tunnel Center
SAE Technical Papers | 2017
|