Offering aircraft fuel efficiency improvements of 30 to 40% over the powerplants it will replace, PW2037 retrofit in the 727-200 Advanced and B-52 aircraft is attracting heightened interest. A comparison of PW2037 technical characteristics with current aircraft powerplants substantiates the improvement potential.The engine installation and modifications necessary for aircraft system compatibility do not impose significant increases in complexity or cost. The resultant improvements in aircraft capability (727 and B-52) and economic viability to airlines (7271 produce aircraft uniquely suited to today's operational requirements and constrained equipment budgets.
727, B-52 Retrofit with PW2037…. Meeting Today's Requirements
Sae Technical Papers
Aerospace Congress and Exposition ; 1982
1982-02-01
Conference paper
English
Meeting today's requirements in railway structures
Engineering Index Backfile | 1940
|Meeting today's requirements for motor cars and trailers
Engineering Index Backfile | 1941
|Manufacturer's philosophy of meeting today's business air transport requirements
Engineering Index Backfile | 1957
|The Air Cargo Business - Meeting Today's Competitive Requirements", (Invited paper)
British Library Conference Proceedings | 1993
|A MANUFACTURER'S PHILOSOPHY OF MEETING TODAY'S BUSINESS AIR TRANSPORT REQUIREMENTS
SAE Technical Papers | 1957
|