The final preparation of the Space Shuttle Orbiter for flight involves the loading of large quantities of hazardous propellants. Additionally, many pyrotechnically operated mechanical joints are armed and ready for flight. The personnel manning at the pad is minimized during these operations to reduce the risk. Upon completition of propellant loading, the flight crew must be boarded onto the vehicle which at this point has tremendous potential energy. Plans have been made to safely and quickly evacuate the crew should some unforeseen contigency occur. Both aided and unaided egress scenarios have been planned. Personnel protective equipment is an important consideration to assure the highest chance for survival. Rapid movement of personnel is enhanced by the use of the slidewire system and specially prepared armored personnel carriers. The end result, as will be discussed in this paper, is a system that provides a reasonable chance of survival should an emergency occur during late countdown at the pad.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Space Shuttle Launch Pad Rescue Plan


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    International Conference On Environmental Systems ; 1991



    Publication date :

    1991-07-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Space Shuttle launch pad rescue plan

    Doerr, Donald F. | NTRS | 1991


    Space Shuttle launch operations

    BACKUS, W. | AIAA | 1971


    Launch-Off-Need Shuttle Hubble Rescue Mission: Medical Issues

    Hamilton, Douglas / Gillis, David / Ilcus, Linda et al. | NTRS | 2008