The unprecedented size of the Mangla Dam Project has lead to the selection, operation, and maintenance of the largest peacetime construction fleet ever assembled. Equipment selection was carefully made, native operators trained and modern production techniques practiced. Resultant mechanical problems were resolved and routine repairs were accomplished by an energetic maintenance program, thus satisfactory results have been achieved by combining American construction industry know-how with good construction machinery and vendor service.
Equipment Selection, Operation and Maintenance at Mangla Dam
Sae Technical Papers
18th Annual Earthmoving Industry Conference ; 1967
1967-02-01
Conference paper
English
Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2018
|Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan
BASE | 2018
|Substation operation and maintenance operation equipment
European Patent Office | 2023
|