The unprecedented size of the Mangla Dam Project has lead to the selection, operation, and maintenance of the largest peacetime construction fleet ever assembled. Equipment selection was carefully made, native operators trained and modern production techniques practiced. Resultant mechanical problems were resolved and routine repairs were accomplished by an energetic maintenance program, thus satisfactory results have been achieved by combining American construction industry know-how with good construction machinery and vendor service.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Equipment Selection, Operation and Maintenance at Mangla Dam


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    18th Annual Earthmoving Industry Conference ; 1967



    Publication date :

    1967-02-01




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan

    Hussain, I. / Cattapan, A. / Franca, J. et al. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2018

    Free access

    Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan

    Hussain, I. / Cattapan, A. / Franca, J. | BASE | 2018

    Free access


    Sustainable Reservoir Management Approaches under Impacts of Climate Change - A Case Study of Mangla Reservoir, Pakistan

    Khan, Muhammad Adnan / Technische Universität Dresden | TIBKAT | 2023

    Free access

    Substation operation and maintenance operation equipment

    WANG GUISHAN / HAO ZHIJIE / LU WENXING et al. | European Patent Office | 2023

    Free access