Abstract Due to the interaction among different planning levels and various travel demands during a day, the transit network planning is of great importance. In this paper, a bi-objective multi-period planning model is proposed for the synchronization of timetabling and vehicle scheduling. The main aim of the problem is to minimize the weighted transfer waiting time in the interchange stations along with the operational costs of vehicles. In order to demonstrate the effectiveness of the proposed integrated model, a real case study of Tehran subway is considered. The proposed model is solved by the ε-constraint method and some outstanding results are achieved.
A subway planning bi-objective multi-period optimization model integrating timetabling and vehicle scheduling: a case study of Tehran
Transportation ; 47 , 1
2018
Article (Journal)
English
A Multi-objective Programming Model for Subway Last Train Timetabling
British Library Conference Proceedings | 2018
|Multi-objective railway timetabling including energy-efficient train trajectory optimization
DOAJ | 2021
|