The rain and flood events across Queensland between 2010 and 2013 showed that the road network is more exposed to damage from such events than desirable, with between 23% and 62% of the state-controlled network closed or with limited access over four consecutive summers. With increasingly uncertain climatic factors and stretched infrastructure budgets, efficient optimisation and prioritisation of works is critical to the overall network condition. Historically, works programs were focused on highest priority treatments, which in some cases resulted in an overall deterioration in network condition over time, as measured by indicators such as roughness and seal age. Strategic timely maintenance and rehabilitation programs are thought to be preferable to one-off major reconstruction programs such as the recently completed Transport Network Reconstruction Program (TNRP). There is a need to review pavement management, maintenance and rehabilitation practices to decrease this exposure to damage in a cost-effective manner. A project under the National Assets Centre of Excellence (NACOE) program has analysed the life-cycle costing implications of rain and flood events in Queensland. This has been undertaken through a series of case studies under three different strategies; a base case mirroring actual experience with a limited rehabilitation and maintenance budget, a 'stitch-in-time' approach with reduced intervention thresholds and reduced event impacts, and a 'full resilience' approach incorporating extensive reconstruction and a vision of full flood immunity. The seven case studies revealed that the approach to minimising the life-cycle cost of major rain and flood events is related to traffic volumes, whereby low-volume remote links may be best suited to adopt a strategy of targeting routine maintenance and value-for-money treatments, while highervolume rural highways would see value in more substantial treatments to avoid costly closures. Sensitivity analyses were conducted, looking at the impact of varying reseal intervals and varied recurrence intervals of major rain and flood events. The project also draws network-wide conclusions to categorise the overall network effect of each of the three strategies.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Life-cycle costing of rain and flood events in Queensland - case studies and network-wide implications



    Published in:

    Publication date :

    2017



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English



    Classification :

    Local classification TIB:    135/7005/1710
    BKL:    55.84 Straßenverkehr



    Life-cycle costing: Practical considerations

    Eisenberger, I. / Lorden, G. | NTRS | 1977


    Life-Cycle Costing Provides Economy

    British Library Online Contents | 1997


    Costing of Aluminium for Life Cycle

    Tan, Xincai / Wang, Jian / Xu, Yuchun et al. | AIAA | 2008


    Life cycle costing of infrastructure projects

    Khare, B. P. / Agarwal, A. K. | British Library Conference Proceedings | 1998


    Life cycle costing and asset management

    Hooley, J. / Horton, R. / Railway Industry Association et al. | British Library Conference Proceedings | 1997