Cost-efficiency is a crucial Key Performance Area (KPA) in today's Air Traffic Management (ATM) system. Traditionally, research has mainly focused on the airport domain, with little attention being paid to the operating cost-efficiency of Area Control Centres (ACCs). This paper addresses this shortcoming and develops a framework to assess the cost-efficiency of an ACC from an operational perspective. It investigates how the resources of an ACC are managed, from the start of the planning process to the day of operation. The framework develops new metrics to assess an ACC's performance. A case study is carried out on the Maastricht Upper Area Control (MUAC) centre. Results show that, despite being one of the most advanced ACCs in Europe, the human workforce is operating at only approximately 50% of their full capabilities.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Framework to Assess an Area Control Centre's Operating Cost-efficiency: a Case Study



    Published in:

    Publication date :

    2015




    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English



    Classification :

    BKL:    53.84 Ortungstechnik, Radartechnik / 53.84 / 55.54 Flugführung / 42.89 / 55.20 / 55.44 / 55.86 / 55.54 / 55.86 Schiffsverkehr, Schifffahrt / 55.20 Straßenfahrzeugtechnik / 42.89 Zoologie: Sonstiges / 55.44 Schiffsführung
    Local classification TIB:    275/5680/7035