This project included AS system abandonment activities for a small portion of the LC39B AS system in support of crane operations planned at LC39B. The specific objectives are: •Remove/cap AS system components and abandon AS/monitoring wells (MWs) within identified area in support of critical mission support construction operations; •Photograph, document size, and location of any AS piping to be left in place; •Provide as-builts with survey data of piping that is left in place so it can be provided to the KSC Mater Planning office for recording by RPM; and •Properly transport concrete and other construction debris off site and dispose of at an appropriate facility in accordance with all local and federal regulations. Following completion of abandonment activities, ensure all areas of operation are graded so no trip hazards exist.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Partial Air Sparge System Abandonment at Launch Complex 39B, SWMU 009 Implementation Report


    Contributors:

    Publication date :

    2023-03-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English