The first airloads measurements were made in the 1950s at NACA Langley on a 15.3-foot model rotor, stimulated by the invention of miniaturized pressure transducers. The inability to predict higher harmonic loads in those early years led the U. S. Army to fund airloads measurements on the CH-34 and the UH-1A aircraft. Nine additional comprehensive airloads tests have been done since that early work, including the recent test of an instrumented UH-60A rotor in the 40- by 80-Foot Wind Tunnel at NASA Ames. This historical narrative discusses the twelve airloads tests and how the results were integrated with analytical efforts. The recent history of the UH-60A Airloads Workshops is presented and it is shown that new developments in analytical methods have transformed our capability to predict airloads that are critical for design.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Rotorcraft Airloads Measurements-Extraordinary Costs, Extraordinary Benefits


    Contributors:

    Conference:

    American Helicopter Society Annual Forum (AHS 2011)


    Publication date :

    2014-08-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Extraordinary traffic

    Jenkins, D.M. | Engineering Index Backfile | 1915


    Tornado : extraordinary dreams

    Ingall, Tom | SLUB | 2010



    EXTRAORDINARY GENERAL MEETING

    Taylor & Francis Verlag | 1926