The Low Density Supersonic Decelerator (LDSD) Project required the use of a pilot system due to the inability to mortar deploy its main supersonic parachute. A mortar deployed 4.4 m diameter supersonic ram-air ballute was selected as the pilot system for its high drag coefficient and stability relative to candidate supersonic parachutes at the targeted operational Mach number of 3. The ballute underwent a significant development program that included the development of a new liquid methanol-based pre-inflation system to assist the ballute inflation process. Both pneumatic and pyrotechnic mortar tests were conducted to verify orderly rigging deployment, bag strip, inflation aid activation, and proper mortar performance. The ballute was iteratively analyzed between fluid and structural analysis codes to obtain aerodynamic and aerothermodynamic estimates as well as estimates of the ballute's structural integrity and shape. The ballute was successfully flown in June 2014 at a Mach number of 2.73 as part of the first LDSD supersonic flight test and performed beyond expectations. Recovery of the ballute indicated that it did not exceed its structural or thermal capabilities. This flight set a historical precedent as it represented the largest ballute to have ever been successfully flown at this Mach number by a NASA entity.
Pilot Deployment of the LDSD Parachute via a Supersonic Ballute
AIAA Aerodynamic Decelerator Systems Technology Conference and Seminar ; 2015 ; Daytona Beach, FL, United States
2015-03-30
Conference paper
No indication
English
PILOT DEPLOYMENT OF THE LDSD PARACHUTE VIA A SUPERSONIC BALLUTE
British Library Conference Proceedings | 2015
|STRESS ANALYSIS OF THE LDSD SUPERSONIC BALLUTE
British Library Conference Proceedings | 2015
|LDSD Supersonic Ballute Design and Packing
AIAA | 2015
|