Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases


    Contributors:

    Conference:

    Biennial NSBE Aerospace Systems Conference 2016 ; 2016 ; Arlington, VA, United States


    Publication date :

    2016-08-24


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English