This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Integrated Test Approach


    Contributors:

    Conference:

    Lockheed Martin Engineering Symposium ; 2015 ; Orlando, FL, United States


    Publication date :

    2015-10-05


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    Integrated Test Approach

    Cotton W. / Liechty J. | NTIS | 2015


    TEST PLANNING, AN INTEGRATED APPROACH

    Denton, Conor / Cox, Daniel / Kim, Harbin | TIBKAT | 2022


    Ares I Integrated Test Approach

    J. Taylor | NTIS | 2008


    Ares I Integrated Test Approach

    Taylor, Jim | NTRS | 2008


    FatigueA Test Integrated Damage Modeling Approach

    Darrell Simpkins / Robert L. Neulieb / Dennis J. Golden | AIAA | 1974