NASA s Mars Science Laboratory mission will launch the next mobile science laboratory to Mars in the fall of 2009 with arrival at Mars occurring in the summer of 2010. A heat shield, parachute, and rocket-powered descent stage, including a sky crane, will be used to land the rover safely on the surface of Mars. The direction of the atmospheric entry vehicle lift vector will be controlled by a hypersonic entry guidance algorithm to compensate for entry trajectory errors and counteract atmospheric and aerodynamic dispersions. The key challenges for mission design are (1) develop a launch/arrival strategy that provides communications coverage during the Entry, Descent, and Landing phase either from an X-band direct-to-Earth link or from a Ultra High Frequency link to the Mars Reconnaissance Orbiter for landing latitudes between 30 deg North and 30 deg South, while satisfying mission constraints on Earth departure energy and Mars atmospheric entry speed, and (2) generate Earth-departure targets for the Atlas V-541 launch vehicle for the specified launch/arrival strategy. The launch/arrival strategy employs a 30-day baseline launch period and a 27-day extended launch period with varying arrival dates at Mars. The key challenges for navigation design are (1) deliver the spacecraft to the atmospheric entry interface point (Mars radius of 3522.2 km) with an inertial entry flight path angle error of +/- 0.20 deg (3 sigma), (2) provide knowledge of the entry state vector accurate to +/- 2.8 km (3 sigma) in position and +/- 2.0 m/s (3 sigma) in velocity for initializing the entry guidance algorithm, and (3) ensure a 99% probability of successful delivery at Mars with respect to available cruise stage propellant. Orbit determination is accomplished via ground processing of multiple complimentary radiometric data types: Doppler, range, and Delta-Differential One-way Ranging (a Very Long Baseline Interferometry measurement). The navigation strategy makes use of up to five interplanetary trajectory correction maneuvers to achieve entry targeting requirements. The requirements for cruise propellant usage and atmospheric entry targeting and knowledge are met with ample margins.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Mission and Navigation Design for the 2009 Mars Science Laboratory Mission


    Contributors:

    Conference:

    International Astronautical Congress (IAC 2008) ; 2008 ; Glasgow, Scotland, United Kingdom


    Publication date :

    2008-09-29


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    Mars Science Laboratory (MSL) : the US 2009 Mars rover mission

    Palluconi, Frank / Tampari, Leslie / Steltzner, Adam et al. | NTRS | 2003



    2011 Mars Science Laboratory Mission Design Overview

    Abilleira, F. / American Society of Civil Engineers | British Library Conference Proceedings | 2010



    Mars Science Laboratory, mission concept review

    Murihead, Brian K. / Naderi, F. / Sander, M. et al. | NTRS | 2003