The Landsat Data Continuity Mission (LDCM) is being developed by NASA and USGS and is currently planned for launch in January 2013 [1]. Once on-orbit and checked out, it will be operated by USGS and officially named Landsat-8. Two sensors will be on LDCM: the Operational Land Imager (OLI), which has been built and delivered by Ball Aerospace & Technology Corp (BATC) and the Thermal Infrared Sensor (TIRS)[2], currently being built and tested at Goddard Space Flight Center (GSFC) with a planned delivery of Winter 2012. The OLI covers the Visible, Near-IR (NIR) and Short-Wave Infrared (SWIR) parts of the spectrum; TIRS covers the Thermal Infrared (TIR). This paper discusses only the OLI instrument and its pre-launch characterization; a companion paper covers TIRS.
The Landsat Data Continuity Mission Operational Land Imager (OLI) Sensor
IEEE International Geoscience and Remote Sensing Symposium (IGARSS) 2012 ; 2012 ; Munich, Germany
2012-07-22
Conference paper
No indication
English