Problem Introduction: 1. Prevent Cold Plate Damage in Space Shuttle. 1a. The number of cold plate problems had increased from an average of 16.5 per/year between 1990 through 2000, to an average of 39.6 per year between 2001through 2005. 1b. Each complete set of 80 cold plates cost approximately $29 million, an average of $362,500 per cold plate. 1c It takes four months to produce a single cold plate. 2. Prevent Cold Plate Damage in Future Space Vehicles.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Avionics Box Cold Plate Damage Prevention


    Contributors:

    Conference:

    2012 IEEE Aerospace Conference ; 2012 ; Big Sky, MT, United States


    Publication date :

    2012-03-03


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    Avionics Box Cold Plate Damage Prevention

    Stambolian, Damon / Larcher, Steven / Henderson, Gena et al. | NTRS | 2011


    Avionics Box Cold Plate Damage Prevention

    D. B. Stambolian / S. W. Larchar / G. Henderson et al. | NTIS | 2012


    Avionics Box Cold Plate Damage Prevention

    D. Stambolian / S. Larcher / G. Henderson et al. | NTIS | 2011


    Avionics box cold plate damage prevention

    Stambolian, Damon B. / Larchar, Steven W. / Henderson, Gena et al. | IEEE | 2012


    Aircraft Avionics (Digital Avionics Study)

    B. E. Bright / B. List / W. Sen et al. | NTIS | 1973