Problem Introduction: 1. Prevent Cold Plate Damage in Space Shuttle. 1a. The number of cold plate problems had increased from an average of 16.5 per/year between 1990 through 2000, to an average of 39.6 per year between 2001through 2005. 1b. Each complete set of 80 cold plates cost approximately $29 million, an average of $362,500 per cold plate. 1c It takes four months to produce a single cold plate. 2. Prevent Cold Plate Damage in Future Space Vehicles.
Avionics Box Cold Plate Damage Prevention
2012 IEEE Aerospace Conference ; 2012 ; Big Sky, MT, United States
2012-03-03
Miscellaneous
No indication
English
Avionics Box Cold Plate Damage Prevention
NTRS | 2011
|Avionics Box Cold Plate Damage Prevention
NTIS | 2012
|Avionics Box Cold Plate Damage Prevention
NTIS | 2011
|Avionics box cold plate damage prevention
IEEE | 2012
|Aircraft Avionics (Digital Avionics Study)
NTIS | 1973
|