The Lunar Reconnaissance Orbiter (LRO) was launched on June 18, 2009. The nominal mission ended on September 15, 2010 and LRO is now on a four-year extended mission. The LRO performances in hot and cold cases are compared to pre-launch analysis predicts, and operational lessons learned are discussed. One instrument has required tighter-than-anticipated thermal control, and two others have frequently requested unanticipated calibration maneuvers that had to be evaluated for their thermal performance. A series of off nadir thermal analyses of the entire orbiter were performed prior to launch, and these predictions are compared to actual maneuvers, with a discussion of the process by which maneuvers can be rapidly evaluated for thermal concerns. On December 21st, 2010, LRO experienced its first severe Lunar Eclipse. Operationally, this required the Spacecraft to pre-heat its main avionics panel in order to minimize control heater power during the period when the Earth blocks the sun from the moon. The operational design and in-flight performance are summarized.
Lunar Reconnaissance Orbiter (LRO) Thermal On-Orbit Performance
41st International Conference on Environmental Systems ; 2011 ; Portland, OR, United States
2011-07-17
Conference paper
No indication
English
Lunar Reconnaissance Orbiter (LRO) Thermal On-Orbit Performance
British Library Conference Proceedings | 2010
|