Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The NASA Experience


    Contributors:

    Publication date :

    2011-01-01


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    NASA Experience

    A. Ramos | NTIS | 2011


    Sharing the NASA Experience

    O. O. Kegege | NTIS | 2018


    Sharing the NASA Experience

    Kegege, Obadiah O. | NTRS | 2018


    NASA INSPIRE Summer STEM Experience

    P. Thakrar | NTIS | 2011


    Recent NASA Dryden COA Experience

    B. Cobleigh | NTIS | 2008