The Magnetospheric Multiscale (MMS) formation flying mission, which consists of four spacecraft flying in a tetrahedral formation, has challenging navigation requirements associated with determining and maintaining the relative separations required to meet the science requirements. The baseline navigation concept for MMS is for each spacecraft to independently estimate its position, velocity and clock states using GPS pseudorange data provided by the Goddard Space Flight Center-developed Navigator receiver and maneuver acceleration measurements provided by the spacecraft's attitude control subsystem. State estimation is performed onboard in real-time using the Goddard Enhanced Onboard Navigation System flight software, which is embedded in the Navigator receiver. The current concept of operations for formation maintenance consists of a sequence of two maintenance maneuvers that is performed every 2 weeks. Phase 2b of the MMS mission, in which the spacecraft are in 1.2 x 25 Earth radii orbits with nominal separations at apogee ranging from 30 km to 400 km, has the most challenging navigation requirements because, during this phase, GPS signal acquisition is restricted to less than one day of the 2.8-day orbit. This paper summarizes the results from high-fidelity simulations to determine if the MMS navigation requirements can be met between and immediately following the maintenance maneuver sequence in Phase 2b.
Magnetospheric Multiscale Mission (MMS) Phase 2B Navigation Performance
2009 AAS/AIAA Astrodynamics Specialist Conference ; 2009 ; Pittsburgh, PA, United States
2009-08-09
Preprint
No indication
English
Magnetospheric Multiscale Mission (MMS) Phase 2b Navigation Performance (AAS 09-324)
British Library Conference Proceedings | 2010
|Relative Navigation Strategies for the Magnetospheric Multiscale Mission
British Library Conference Proceedings | 2004
|