Four missions have successfully employed aerobraking at Venus and Mars to reduce the spacecraft orbit period and achieve the desired orbit geometry. The propellant mass reductions enabled by the aerobraking technique allow the use of smaller launch systems, which translate to significant savings in launch costs for flight projects. However, there is a significant increase in mission risk associated with the use of aerobraking. Flying a spacecraft through a planetary atmosphere hundreds of times during months of around-the-clock operations places the spacecraft in harm's way, and is extraordinarily demanding on the flight team. There is a cost/risk trade that must be evaluated when a project is choosing between a mission baseline that includes aerobraking, or selecting a larger launch vehicle to enable purely propulsive orbit insertion. This paper provides a brief history of past and future aerobraking missions, describes the aerobraking technique, summarizes the costs associated with aerobraking, and concludes with a suggested methodology for evaluating the cost/risk trade when considering the aerobraking approach.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Aerobraking Cost and Risk Decisions


    Contributors:

    Conference:

    Space Systems Engineering Conference ; 2005 ; Atlanta, GA, United States



    Publication date :

    2006-10-18


    Type of media :

    Preprint


    Type of material :

    No indication


    Language :

    English




    Aerobraking cost/risk decisions

    Spencer, David A. / Tolson, Robert | NTRS | 2005


    Aerobraking Cost and Risk Decisions

    David Spencer / Robert Tolson | AIAA | 2007


    Aerobraking Cost and Risk Decisions

    Spencer, D.A. | Online Contents | 2007


    Regenerative Aerobraking

    Moses, R. W. | British Library Conference Proceedings | 2005


    Regenerative Aerobraking

    R. W. Moses | NTIS | 2004