The Flight IPT assessed the reasonableness of demonstrating each of the Access 5 Step 1 functional requirements. The functional requirements listed in this matrix are from the September 2005 release of the Access 5 Functional Requirements Document. The demonstration mission considered was a notional Western US mission (WUS). The conclusion of the assessment is that 90% of the Access 5 Step 1 functional requirements can be demonstrated using the notional Western US mission.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Airspace Operations Demo Functional Requirements Matrix


    Publication date :

    2005-09-01


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    Future Airspace Operations

    P. Kopardekar | NTIS | 2023


    Future Airspace Operations

    Parimal Kopardekar | NTRS


    Future Airspace Operations

    Parimal Kopardekar | NTRS


    Future Airspace Operations

    P. Kopardekar | NTIS | 2022


    Requirements for Super Dense Operations for the NGATS Terminal Airspace

    Krozel, Jimmy / Spencer, Amy / Smith, Phil et al. | IEEE | 2007