The science activity planning process for the 2003 Mars Exploration Rover (MER) mission was exercised in a ten day terrestrial rover field test in August 2002. A version of the MER mission Science Activity Planner (SAP) tool was used for downlink data visualization and uplink plan generation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The science activity planner for the Mars Exploration Rover mission: FIDO field test results


    Contributors:
    Backes, P. G. (author) / Norris, J. S. (author) / Powell, M. W. (author) / Vona, M. A. (author) / Steinke, R. (author) / Wick, J. (author)

    Conference:

    2003 IEEE Aerospace Conference


    Publication date :

    2003-03-08


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    The science activity planner for the mars exploration rover mission: fido field test results

    Backes, P.G. / Norris, J.S. / Powell, M.W. et al. | IEEE | 2003


    12.0303 The Science Activity Planner for the Mars Exploration Rover Mission: FIDO Field Test Results

    Institute of Electrical and Electronics Engineers | British Library Conference Proceedings | 2003


    FIDO: Enabling Mars Rover Science Operations

    Haldemann, A. / Backes, P. / Baumgartner, E. et al. | NTRS | 2000


    FIDO: Enabling Mars Rover Science Operations

    Haldemann, A. / Arvidson, R. / Backes, P. et al. | NTRS | 2000


    Distributed Operations for the Mars Exploration Rover Mission with the Science Activity Planner

    Wick, J. V. / Callas, J. L. / Norris, J. S. et al. | British Library Conference Proceedings | 2005