This document is intended to provide the Mars Surveyor 2001 Project Science Group (PSG) with an overview of all the significant impacts of landing site location on the flight system, mission design, and science return. In order to facilitate the design of the Rover and Lander systems, the Project has requested that the PSG select a 15 latitude band within the 15S to 30N region, at the site selection workshop to be held at NASA Ames Research Center on January 26-27, 1998.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Landing Site Mission Impacts


    Contributors:
    Spencer, D. (author)


    Publication date :

    1998-01-01


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    LANDING SITE SELECTION AND LANDING DISPERSION ANALYSIS FOR THE HAYABUS A2 MISSION

    Kikuchi, Shota / Saiki, Takanao / Terui, Fuyuto et al. | TIBKAT | 2020


    Mars 2020 Surface Mission Modeling Landing Site Thermal Environments

    Lange, Robert D. / Wagner, Travis L. | NTRS | 2018


    Mars 2020 surface mission modeling landing site thermal environments

    Wagner, Travis L. / Lange, Robert D. | IEEE | 2018


    Mars 2020 Surface Mission Modeling Landing Site Thermal Environments

    Lange, Robert D. / Wagner, Travis L. | NTRS | 2018


    Mars 2020 Surface Mission Modeling: Landing Site Thermal Environments

    Lange, Robert D. / Wagner, Travis L. | NTRS | 2018