The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    International Space Station Multi-Element Integrated Test


    Contributors:

    Publication date :

    1999-01-01


    Type of media :

    Preprint


    Type of material :

    No indication


    Language :

    English




    Multi-Element Integrated Testing of International Space Station Electrical Subsystems

    Singh-Derewa, C. | British Library Conference Proceedings | 2001


    International Space Station U.S. Major Element Laboratory Power Quality Test

    Gholdston, E.W. / Aintablian, H.O. / Wilde, R.K. | SAE Technical Papers | 1999


    International Space Station Integrated Verification Process

    Haskins, B. R. | British Library Conference Proceedings | 2001