Live footage of the Delta XTE (X-Ray Timing Explorer) fairing installation is presented. The fairing is installed to provide a smooth surface for the airflow. The primary purpose of the fairing is to reduce drag. The installation of the fairing occurred at complex 17-B CCAS (Cape Canaveral Air Station).
Delta XTE Fairing Installation at Complex 17-B CCAS
1995-11-30
Audio-visual
No indication
English
Delta XTE Spacecraft Arrives at CCAS Skid Strip
NTRS | 1995
COMPLEX AUTOMATION SYSTEM FOR CONTROL OF SORTING PROCESS (CCAS SP)
European Patent Office | 2020
|