During this annual progress report time period, the following activities took place: (1) Generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch. These were written and submitted by A. Galvin after consultation (phone, fax, e-mail, meetings) with the CELIAS Instrument Manager and Lead-Co-I's. (2) Identification of several problems with the CELIAS portion of the Project Data Base (PDB). (3) Meetings with the Flight Operations Team regarding PDB, critical commands, etc. (4) Attend Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995). (5) Participate in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995). (6) Participate in the Ground System Compatibility Test Rehearsal (April 24- 28, 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22, 1995), and GSCT #4b (October 30-November 5, 1995). A small portion of the documentation for the above cited activities is appended.
Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft
1996-03-07
Report
No indication
English
The Sun at Minimum Activity: Results from the CELIAS Experiment on SOHO
British Library Online Contents | 1997
|The SOHO CELIAS/SEM EUV Database From SC23 Minimum to the Present
British Library Conference Proceedings | 2002
|The Charge, Element and Isotope Analysis System (CELIAS) on SOHO
British Library Online Contents | 1992
|