The thermal control system (TCS) for the space station assembly complete configuration includes a two-phase central thermal bus with a supplemental body mounted radiator system. Evolution of the space station from a heat rejection capacity of 75 kW to 300 kW will require scars to expand the thermal fluid distribution network, equipment replacement to enable greater thermal transport capacity, and enlargement of the heat rejection subsystem for increased heat rejection. The TCS requirements for assembly completion and growth are presented along with a review of the basic structure of the active and passive thermal control systems which include provisions for growth.
Space Station thermal control system evolution
1990-01-01
Conference paper
No indication
English
The Evolution of the Space Station Freedom Thermal Control System
SAE Technical Papers | 1992
|Tema Archive | 1984
|