Initial results of the integrated AR POST conducted by Boeing at Marshall Space Flight Center in 1992 are presented. The three baselined ECLSS Man Tended Capability AR assemblies were integrated and operated in a closed door chamber in which the internal atmosphere was monitored. The test provides a prerequisite checkout of the AR subsystem in preparation for longer duration tests in which the AR subsystem will be integrated with the Water Recovery Management subsystem. The integrated AR POST will serve as an early test bed to evaluate the integration of the space station ECLSS AR subsystem during design maturation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Initial accomplishments of the Environmental Control and Life Support System (ECLSS) atmosphere revitalization (AR) predevelopment operational system test (POST) for the Space Station Freedom (SSF)


    Contributors:

    Conference:

    SAE, International Conference on Environmental Systems ; 1992 ; Seattle, WA, United States


    Publication date :

    1992-07-01


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English