The Space Station Environmental Control and Life Support System (ECLSS) contract with NASA MSFC covered the time frame from 9 May 1985 to 31 Dec. 1992. The contract roughly covered the period of Space Station Freedom (SSF) development from early Phase B through Phase C/D Critical Design Review (CDR). During this time, McDonnell Douglas Aerospace-Huntsville (formerly McDonnell Douglas Space Systems Company) performed an analytical support role to MSFC for the development of analytical math models and engineering trade studies related to the design of the ECLSS for the SSF.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Space Station ECLSS Integration Analysis


    Publication date :

    1993-01-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    Assembly and Integration of the Space Station Freedom ECLSS

    Gould, M. J. | SAE Technical Papers | 1992


    G189A Modelling of Space Station Freedom's ECLSS

    R. S. Barker / R. Vonjouanne | NTIS | 1991


    Growth evolution of the Space Station ECLSS

    HUMPHRIES, W. / SOSNAY, R. | AIAA | 1986