Following launch in June 1992, the TOPEX/Poseidon satellite will be placed in a near-circular frozen orbit at an altitude of about 1336 km. Orbit maintenance maneuvers are planned to assure all nodes of the 127-orbit 10-day repeat ground track remain within a 2 km equatorial longitude bandwidth. Orbit determination, maneuver execution, and atmospheric drag prediction errors limit overall targeting performance. This paper focuses on the effects of drag modeling errors, with primary emphasis on the role of SESC solar activity predictions, especially the 27-day outlook of the 10.7 cm solar flux and geomagnetic index used by a simplified version of the Jacchia-Roberts density model developed for this TOPEX/Poseidon application. For data evaluated from 1983-90, the SESC outlook performed better than a simpler persistence strategy, especially during the first 7-10 days. A targeting example illustrates the use of ground track biasing to compensate for expected orbit predictions errors, emphasizing the role of solar activity prediction errors.
The role of predicted solar activity in TOPEX/Poseidon orbit maintenance maneuver design
AAS/AIAA Astrodynamics Conference ; 1991 ; Durango, CO, United States
1992-01-01
Conference paper
No indication
English
TOPEX/POSEIDON orbit maintenance maneuver design
NTRS | 1990
|TOPEX/Poseidon orbit acquisition maneuver design
NTRS | 1992
|TOPEX/Poseidon Orbit Acquisition Maneuver Sequence
British Library Conference Proceedings | 1993
|TOPEX/Poseidon Orbit Acquisition Maneuver Sequence (AAS 93-571)
British Library Conference Proceedings | 1993
|Topex/Poseidon Autonomous Maneuver Esperiment (TAME)
NTRS | 1996
|