The STS-35 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem activities during this thirty-eighth flight of the Space Shuttle and the tenth flight of the Orbiter vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of an External Tank (ET) (designated as ET-35/LWT-28), three Space Shuttle main engines (SSME's) (serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively), and two Solid Rocket Boosters (SRB's) designated as BI-038. The primary objectives of this flight were to successfully perform the planned operations of the Ultraviolet Astronomy (Astro-1) payload and the Broad-Band X-Ray Telescope (BBXRT) payload in a 190-nmi. circular orbit which had an inclination of 28.45 degrees. The sequence of events for this mission is shown in tablular form. Summarized are the significant problems that occurred in the Orbiter subsystems during the mission. The official problem tracking list is presented. In addition, each Orbiter subsystem problem is cited in the applicable subsystem discussion.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    STS-35 Space Shuttle mission report


    Contributors:

    Publication date :

    1991-01-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    STS-42 Space Shuttle mission report

    Fricke, Robert W. | NTRS | 1992



    STS-72 Space Shuttle Mission Report

    Fricke, Robert W., Jr. | NTRS | 1996


    STS-78 Space Shuttle Mission Report

    R. W. Fricke | NTIS | 1996


    STS-75 Space Shuttle Mission Report

    R. W. Fricke | NTIS | 1996