The following issues are covered: process development frequently lags behind material development, high fabrication costs, flex joints (bellows) - a continuing program, SRM fabrication-induced defects, and in-space assembly will require simplified design.
Manufacturing processes
1991-05-01
Conference paper
No indication
English
Online Contents | 1995
Online Contents | 1995
Online Contents | 1994
Online Contents | 1995
Online Contents | 1994