The evolution of one of the new generation of test sets developed for the Solid Rocket Booster of the U.S. Space Transportation System. Requirements leading to factory checkout of the test set are explained, including the evolution from manual to semiautomated toward fully automated status. Individual improvements in the built-in test equipment, self-calibration, and software flexibility are addressed, and the insertion of fault detection to improve reliability is discussed.
Evolution of solid rocket booster component testing
1989-07-01
Conference paper
No indication
English
Evolution of solid rocket booster component testing
AIAA | 1989
|Space shuttle solid rocket booster redesign and testing
NTRS | 1989
|SOHO Solid Rocket Booster Installation
NTRS | 1995
Solid rocket booster retrieval operations
NTRS | 1985
|